Project Overview
Project Type: Power Distribution & Electrification Expansion
Completion Date: June 2024
Location: Luzon & Mindanao, Philippines
Key Partners: National Electrification Administration (NEA) & Meralco
---
Technical Solution
TSTYNICE supplied single-phase pole-mounted transformers and ZGS-type compact substations to support both rural grid extension and urban commercial upgrades.
Equipment Supplied:
15 kVA–167 kVA Single-Phase Pole-Mounted Transformers
500 kVA–1250 kVA **ZGS Compact Transformers (Pad-Mounted)
Key Features:
Primary voltage: 13.2 kV / 7.62 kV, secondary voltage: 240/120 V or 400/230 V
Corrosion-resistant coating for coastal and tropical climates
Energy-efficient core (IEC 60076 compliant) reducing losses by 10–15%
Compact pad-mounted design suitable for commercial and urban applications
Fully sealed, maintenance-free oil-immersed design
---
Project Impact
Operational Results:
Electrification coverage expanded to 120+ rural barangays
Improved grid reliability with 99.97% uptime
Reduced line losses and simplified transformer maintenance
Economic & Social Benefits:
Provided reliable power for schools, health centers, and small industries
Supported the **Philippine Energy Access Program (NEA)
Enhanced urban distribution stability for growing commercial zones
Why TSTYNICE?
30 years of manufacturing experience in distribution & compact transformers
Tailor-made designs for tropical and coastal environments
Compliant with Philippine grid codes and IEC 60076 standards
Local service support for installation and after-sales maintenance
TSTYNICE Transformer Solutions for Shanghai-Nantong Railway Electrification Project
Project Overview
Project Type: High-Speed Railway Electrification
Completion Date: November 2020
Location: Shanghai-Nantong Railway (Nantong to Anting Section)
Key Partners: China Railway Group & Pingmei Shenma Group
Tehnical Solution
TSTYNICE supplied oil-immersed power distribution transformers (≤35kV) and box-type substations for:
3 traction substations
4 sub-stations
2 switching stations
Transformer Features:
Designed for 200 km/h high-speed rail operations
High efficiency & low-loss core for 24/7 reliability
Vibration-resistant construction for railway environments
Compact design for space-saving installation
Project Impact
Operational Efficiency:
137.28 km electrified railway section
Reduced travel time between Shanghai, Nantong & Northern Jiangsu
Economic & Regional Development:
Enhanced Yangtze River Delta integration
Facilitated industrial relocation & resource sharing
Strengthened regional economic connectivity
Why TSTYNICE?
Strategic Partner of China Railway for critical power infrastructure
Customized solutions for high-speed rail applications
Proven reliability in large-scale transportation projects
Enhanced Version Highlights:
Structured Presentation – Clear sections for easy reading
Technical & Business Benefits – Highlights both engineering and economic impact
Railway-Specific Adaptation – Emphasizes vibration resistance & high-speed compatibility
Regional Development Focus – Connects infrastructure to economic growth