TSTYNICE Transformer Solutions for the Philippines Rural Electrification and Urban Distribution Project

Project Overview


Project Type: Power Distribution & Electrification Expansion

Completion Date: June 2024

Location: Luzon & Mindanao, Philippines

Key Partners: National Electrification Administration (NEA) & Meralco


---


Technical Solution


TSTYNICE supplied single-phase pole-mounted transformers and ZGS-type compact substations to support both rural grid extension and urban commercial upgrades.


Equipment Supplied:


15 kVA–167 kVA Single-Phase Pole-Mounted Transformers

500 kVA–1250 kVA **ZGS Compact Transformers (Pad-Mounted)


Key Features:


Primary voltage: 13.2 kV / 7.62 kV, secondary voltage: 240/120 V or 400/230 V

Corrosion-resistant coating for coastal and tropical climates

Energy-efficient core (IEC 60076 compliant) reducing losses by 10–15%

Compact pad-mounted design suitable for commercial and urban applications

Fully sealed, maintenance-free oil-immersed design


---


Project Impact


Operational Results:


Electrification coverage expanded to 120+ rural barangays

Improved grid reliability with 99.97% uptime

Reduced line losses and simplified transformer maintenance


Economic & Social Benefits:


Provided reliable power for schools, health centers, and small industries

Supported the **Philippine Energy Access Program (NEA)

Enhanced urban distribution stability for growing commercial zones


Why TSTYNICE?


30 years of manufacturing experience in distribution & compact transformers

Tailor-made designs for tropical and coastal environments

Compliant with Philippine grid codes and IEC 60076 standards

Local service support for installation and after-sales maintenance

TSTYNICE Transformer Solutions for Shanghai-Nantong Railway Electrification Project



Project Overview

Project Type: High-Speed Railway Electrification

Completion Date: November 2020

Location: Shanghai-Nantong Railway (Nantong to Anting Section)

Key Partners: China Railway Group & Pingmei Shenma Group


Tehnical Solution

TSTYNICE supplied oil-immersed power distribution transformers (≤35kV) and box-type substations for:

3 traction substations

4 sub-stations

2 switching stations


Transformer Features:

Designed for 200 km/h high-speed rail operations

High efficiency & low-loss core for 24/7 reliability

Vibration-resistant construction for railway environments

Compact design for space-saving installation


Project Impact

Operational Efficiency:

137.28 km electrified railway section

Reduced travel time between Shanghai, Nantong & Northern Jiangsu

Economic & Regional Development:

Enhanced Yangtze River Delta integration

Facilitated industrial relocation & resource sharing

Strengthened regional economic connectivity


Why TSTYNICE?

Strategic Partner of China Railway for critical power infrastructure

Customized solutions for high-speed rail applications

Proven reliability in large-scale transportation projects


Enhanced Version Highlights:

Structured Presentation – Clear sections for easy reading

Technical & Business Benefits – Highlights both engineering and economic impact

Railway-Specific Adaptation – Emphasizes vibration resistance & high-speed compatibility

Regional Development Focus – Connects infrastructure to economic growth


Telephone

More >>
+86-18135684124

Quick Links

Products

Solution

About Us

​Copyright © 2025 TSTYNICE. All Rights Reserved. |  Sitemap