Xinjiang Wind Power Project, China
Project Overview:
Project Type: Onshore Wind Farm
Completion Date: November 2020
Location: Mori Kazakh Autonomous County, Xinjiang Uygur Autonomous Region, China
Technical Solution:
TSTY supplied oil-immersed power distribution transformers for the 100MW wind power generation facility.
Project Impact:
Upon commissioning, the project achieved:
✓ Full capacity grid connection
✓ Annual power generation: 250 million kWh
✓ Annual CO₂ reduction: 230,000 tons (equivalent to saving 78,500 tons of standard coal)
✓ Significant contribution to local energy structure optimization and regional economic development
Key Features:
• Designed for extreme temperature variations in Xinjiang (-30°C to 40°C)
• Special anti-corrosion treatment for desert/sandy conditions
• Compliant with China's Class II wind region requirements