Availability: | |
---|---|
Photovoltaic Box-Type Energy Storage Transformer Substation not only converts solar energy into usable electrical power, but also stores surplus electricity in a battery energy storage system (BESS). During periods of low sunlight—such as night time or cloudy days—the stored energy ensures a stable, uninterrupted power supply. Advantages of Choosing TSTYNICE Photovoltaic Box-Type Energy Storage Transformer Substation
| ![]() |
![]() | Product Features of Photovoltaic Box-Type Energy Storage Transformer Substation 1. High Reliability & Energy Efficiency
2. Integrated & Compact Structure
3. Flexible Modular Design
4. Advanced Insulation & Sealing Technology
5. Strong Environmental Adaptability
|
No. | Items | Unit | Value | ||
1 | Rated voltage | Primary | 40.5 | ||
Secondary | kV | 12;0.69 | |||
Subsidiary circuit | V | 110;220;380 | |||
2 | Rated current | High voltage circuit | 400~1250 | ||
Low voltage circuit | A | 630~3150 | |||
3 | Rated frequency | Hz | 50 | ||
4 | Rated power | kVA | 1250;1600;2000~20000 | ||
5 | Rated insulation level | High voltage side | Power frequency | kV | 95 |
impact | 185 | ||||
Low voltage side | Powerfrequency | 42 | |||
impact | 75 | ||||
6 | Rated short time withstand current | High voltage side | kA | 20;25;31.5 | |
Low voltage side | 25;31.5;40 | ||||
7 | Rated peak withstand current | High voltage side | 50;63;80 | ||
Low voltage side | 63;80;100 | ||||
8 | Insulation level of transformer | Power frequency | kV | 65 | |
Impact | 185 | ||||
9 | Insulation level of subsidiary circuit | 2 |
Spanning 250,000 in Henan, our smart factory leverages 5G automation to produce 3,000+ IEC/CE-certified substations annually. With 158 patents and 99% automation, we power projects across 80+ countries.
![]() | ![]() | ![]() | ![]() |
![]() | ![]() | ![]() | ![]() |
Q: Are you a factory or a trade company?
A: Integrated Manufacturing & Trading, OEM/ODM available.
Q: Our Advantage?
A: 30 years experience, Advanced production equipments, Stable quality, Fast delivery, Professional & good & Prompt service.Also some free parts can be provided.
Q: How long is your delivery time?
A: it is depends on your quantity,generally within 15-20 days upon receipt of the advance payment.
Q: What is your payment terms?
A : T/T, L/C,Visa Paypal ,Weatern Union for different circumstances.
Q: Do you have inspection procedure before shiping?
A: Yes,we do 100% QC inspection
Q: What certificates do you have?
A: CESGS ISOIEC StandardsGost Certificates.
Long-term strategic partnerships with DuPont, ABB, Siemens, etc.
Q:AS we knew, when we make order, some suppliers used lower material insted of high quality material products and send to us, how can i trust you?
A: we suggest clients to test the material after receiving goods. We aim to do long term business, not one times.
TSTYNICE transformers hold ISO 9001, IEC 60076, CE, GOST, SGS, and BV certifications, with 158 patents (20 inventions). Our CNAS-accredited lab ensures global compliance across 80+ markets.
![]() | ![]() | ![]() | ![]() | ![]() |
![]() | ![]() | ![]() | ![]() | ![]() |
![]() | ![]() | ![]() | ![]() | ![]() |
![]() | ![]() | ![]() | ![]() | ![]() |