| Availability: | |
|---|---|
Key Features
| ![]() |
![]() |
Applications:
|
| Item | Parameter Range | Notes |
|---|---|---|
| Rated Capacity (Transformer) | 1 MVA – 80 MVA | Customized per wind farm requirements |
| High Voltage (HV) Side | 35kV / 66kV / 110kV | Grid connection voltage |
| Low Voltage (LV) Side | 0.4kV / 0.69kV / 10kV / 20kV / 33kV | Output from wind turbine generators |
| Frequency | 50 Hz / 60 Hz | Per project region |
| Vector Group | Dyn11 / YNd1 / YNd11 | Common connection types |
| Short Circuit Impedance | 4% – 12% | Customized as required |
| Cooling Method | ONAN / ONAF / Forced Air Cooling | Depends on capacity & site |
| Insulation Level | Up to AC 200kV LI / 450kV BIL | Per IEC / IEEE standards |
| Protection Devices | Gas Relay, Pressure Relief Valve, Oil Temp Indicator, LV/HV Protection Relays | Safety standard |
| Enclosure Type | Prefabricated Container / Skid-Mounted / Modular Cabin | Outdoor, weatherproof |
| Auxiliary Systems | Ventilation, Fire Protection, SCADA Monitoring, Communication | Optional |
| Environment Adaptability | -45°C to +50°C | Suitable for desert, plateau, coastal conditions |
| Installation | Prefabricated, plug-and-play | Reduced civil works, faster commissioning |
| Standards | IEC 60076, IEC 62271, IEEE C57, GB/T 17468 | International compliance |
Spanning 250,000 in Henan, our smart factory leverages 5G automation to produce 3,000+ IEC/CE-certified substations annually. With 158 patents and 99% automation, we power projects across 80+ countries.
![]() | ![]() | ![]() | ![]() |
![]() | ![]() | ![]() | ![]() |
Q: Are you a factory or a trade company?
A: Integrated Manufacturing & Trading, OEM/ODM available.
Q: Our Advantage?
A: 30 years experience, Advanced production equipments, Stable quality, Fast delivery, Professional & good & Prompt service.Also some free parts can be provided.
Q: How long is your delivery time?
A: it is depends on your quantity,generally within 15-20 days upon receipt of the advance payment.
Q: What is your payment terms?
A : T/T, L/C,Visa Paypal ,Weatern Union for different circumstances.
Q: Do you have inspection procedure before shiping?
A: Yes,we do 100% QC inspection
Q: What certificates do you have?
A: CE/SGS/ISO/IEC Standards, Gost Certificates.
Long-term strategic partnerships with DuPont, ABB, Siemens, etc.
Q:AS we knew, when we make order, some suppliers used lower material insted of high quality material products and send to us, how can i trust you?
A: we suggest clients to test the material after receiving goods. We aim to do long term business, not one times.
TSTYNICE transformers hold ISO 9001, IEC 60076, CE, GOST, SGS, and BV certifications, with 158 patents (20 inventions). Our CNAS-accredited lab ensures global compliance across 80+ markets.
![]() | ![]() | ![]() | ![]() | ![]() |
![]() | ![]() | ![]() | ![]() | ![]() |
![]() | ![]() | ![]() | ![]() | ![]() |
![]() | ![]() | ![]() | ![]() | ![]() |