Project Overview:
Project Type: Industrial Zone Power Distribution System
Completion Date: March 2022
Location: Lahore Special Economic Zone, Punjab Province, Pakistan
Technical Solution:
TSTY supplied dry-type power transformers (10kV/0.4kV) for the 80MW industrial power supply network, covering manufacturing plants, logistics hubs, and supporting infrastructure within the zone.
Project Impact:
Upon commissioning, the project achieved:
✓ Stable power supply for 56 key enterprises in the zone
✓ Annual power distribution capacity: 190 million kWh
✓ Reliable power guarantee for 12,000+ local jobs
✓ Acceleration of industrialization process in central Punjab and promotion of regional trade development
Key Features:
• Adapted to high-temperature and high-humidity climate in Lahore (35°C to 48°C in summer, 60%-85% humidity)
• Dust-proof and moisture-proof structural design for industrial environment
• Compliant with Pakistan National Electric Code (PNEC) and IEC 60076 standards
• Low noise operation (≤55dB) to meet industrial zone environmental requirements
• Short-circuit resistance enhancement for unstable grid conditions