Project Overview:
Project Type: Grid-Scale Lithium-Ion Energy Storage System
Completion Date: March 2025
Location: Bexley, London, United Kingdom
Technical Solution:
TSTY provided a 50MWh lithium-ion energy storage cabinet system, integrated with intelligent energy management software, to support the UK's national grid in peak load regulation and renewable energy consumption.
Project Impact:
Upon commissioning, the project achieved:
✓ Seamless grid connection with UK National Grid standards
✓ Annual peak-load shaving capacity: 180 million kWh
✓ Annual CO₂ reduction: 95,000 tons (equivalent to replacing 21,000 gasoline-powered vehicles)
✓ Critical support for the UK's "Net Zero by 2050" strategy and stabilization of regional power supply
Key Features:
• Adapted to temperate maritime climate of London (0°C to 28°C) with advanced thermal management system
• IP65 protection rating for resistance to high humidity and coastal air corrosion
・Compliant with UK G99 grid connection standards and 消防安全 (fire safety) regulations for energy storage facilities
• Modular design enabling flexible capacity expansion (upgradable to 100MWh